Loading...
HomeMy WebLinkAbout07 JULY 2025_ City Status Report TUBUVT!SFQPSUT! GPS!UIF!NPOUI! PG UBCMF!PG!DPOUFOUT! .S o Airport o Main street o Tourism . o o C o . . o Fire/EMS A o Fire Marshal’s O . . o o Crime Stats . July Airport Aircraft Operations1310 AvGas Fuel Sales (Gallons)4113.2 Jet Fuel Sales (Gallons)4,538.00 Courtesy Car Use48 # FaceBook Post Views3,738 # FaceBook Post Reach19,110 # attend Advisory Board Meeting5 # of leased T-hangars40 # of people on hangar waiting list44 Main Street# of Businesses In Historical District91 # of Businesses claimed in DISTRX19 # of Business Contact Visits35 # of FaceBook Posts40 # of Facebook Impressions-number of times content was seen on 79061 screen # of Facebook Reach-estimated number of people who saw content25985 # of Facebook Followers4305 # of Instragram Followers954 # attend Downtown Hall Meeting9 # attend Main Street Advisory Board Meeting7 # of vacant business buildings in the historic District9 # of events4 Tourism# of Literature Distributed # of Advertisments in Publications0 # of Business Contact Visits3 # of Facebook Posts25 # of Facebook Impressions # of Facebook Interactions1.3K # of Facebook Followers10K # of Instragram Followers2091 # of Instragram Posts15 # of Instragram Reach2605 # of Instragram Interactions390 # of Instagram views 14,928 # attend Tourism Advisory Board Meeting7 # attend Western Heritage Board Meetingn/a # of events2 Tour Texas Visitor Guide Requests47 Technology# of visits to Website Homepage # of views on main page video # of Mobile App Sessions # of Mobile App Active Users # of New Mobile App Users Average Number of Hours to complete Service requestUp to 3 # of inbound Phishing attempts blocked959 # of inbound Spam attempts blocked5203 3 of ibound Edge Protection 3311 GIS# of Maps updated82 # of Maps produced/generated by request26 # of GIS Errors in the NCT911 System0 # of drone flight missions3 Permit Type Report Permit Date 07/01/2025 to 07/31/2025 DescriptionFeesPermitsFees Accessory Building0.001$0.00 Accessory Building Permit 100.001$100.00 Board of Adjustment210.001$210.00 Certificate of Occupancy300.003$300.00 Civil $0.000.001 Commercial Building Permit2,323.622$2,323.62 Commercial Remodel Permit7,970.502$7,970.50 Electrical$365.00365.007 Final Plat$1,575.001,575.003 Fire Alarm$210.00210.001 Food Service Permit1,383.003$1,383.00 Food Services$461.00461.001 Irrigation$150.00150.003 Liquor License$60.0060.001 Mechanical$150.00150.003 Minor Waiver$210.00210.001 Planning and Zoning620.002$620.00 Plumbing$0.000.001 Pre-Development$0.000.001 Public Right of Way $0.000.002 Construction Permit Residential Building Permit12,056.883$12,056.88 Residential Remodel Permit829.803$829.80 Sidewalk $0.000.001 Sign Permit$226.00226.003 Solar Panel$195.00195.003 Street Closure$0.000.005 Swimming Pool$642.00642.001 Water/Sewer Tap2,165.001$2,165.00 Total$32,202.8032,202.8060 Fees Breakdown 8/18/2025 3:00:21 PM Case Violation Report 7/1/2025 - 7/31/2025 Violation Violation DateStatusDate ClosedZoneViolation NameStatus High Grass 7/31/2025Zone 6Open and Weeds Violation High Grass 7/31/2025Open and Weeds Violation High Grass 7/31/2025Open and Weeds Violation High Grass 7/31/2025Open and Weeds Violation High Grass 7/30/2025Zone 6Open and Weeds Violation High Grass 7/30/2025Open and Weeds Violation High Grass 7/28/20258/4/2025Zone 6Open and Weeds Violation High Grass 7/18/20258/1/2025Open and Weeds Violation High Grass 7/18/20258/1/2025Open and Weeds Violation High Grass 7/11/20257/23/2025Open and Weeds Violation High Grass 7/11/2025Open and Weeds Violation High Grass 7/11/20257/14/2025Open and Weeds Violation High Grass 7/11/20257/21/2025Open and Weeds Violation High Grass 7/9/20257/25/2025Zone 3Open and Weeds Violation High Grass 7/7/20257/28/2025Zone 2Open and Weeds Violation Total Records: 158/18/2025 Page: 1 of 1 DJUZ!PG!TUFQIFOWJMMF DPNCJOFE!TUBUFNFOU!PG!DBTI!QPTJUJPO!.!BMM!GVOET BU!KVMZ!42-!3136 UPUBM GVOENpofz!NbslfuUfyTUBSUfyQppmJowftunfoutPO!EFQPTJU HFOFSBM!GVOE5-977-179:-237-64524-::3-713 DBQJUBM!QSPKFDU!GVOE!:9:-7685-2:2-33:6-291-997 QPPMFE!!DBTI3-633-::33-633-::3 IFBMUI!JOTVSBODF!GVOE252-822252-822 EFCU!TFSWJDF!GVOE3:5-8283:5-828 TQFDJBM!SFWFOVF!GVOE3-277-:113-277-:11 TFEB67:-58567:-585 DIJME!TBGFUZ2:-23:2:-23: DPVSU!UFDIOPMPHZ72-44972-449 QVCMJD!TBGFUZ316-96:316-96: VUJMJUZ!GVOE:-291-769247-25::-427-918 3112!CPOE!J!'!T259-597259-597 3124!CPOE!J!'!T244-735244-735 / 3129!CPOE!J!'!T:53-364:53-364 3133!CPOE!J!'!T!536-427536-427 NFUFS!SFQMBDFNFOU!J!'!T8:-1:48:-1:4 MBOEGJMM!GVOE4-72:-7274-72:-727 TUPSN!XBUFS!ESBJOBHF2-278-69:2-278-69: UBY!JODSFNFOU!GJOBODJOH!GVOE393-771393-771 JOWFTUNFOUT3-713-3683-713-368 !UPUBM!BMM!GVOET3-:6:-53126-572-7::33-95:-:443-713-36854-984-41: CǒƓķƭ 5źƭƷƩźĬǒƷźƚƓ Investments Money Market 2,602,257 2,959,420 6% 7% TexSTAR 15,461,699 35% TexPool 22,849,933 52% ! DJUZ!PG!TUFQIFOWJMMF DPNCJOFE!TUBUFNFOU!PG!SFDFJQUT!BOE!EJTCVSTFNFOUT!.!BMM!GVOET GPS!UIF!NPOUI!FOEJOH!KVMZ!42-!3136 ! CBMBODFEJTCVSTF.CBMBODF GVOE17041036SFDFJQUTNFOUT18042036 HFOFSBM!GVOE26-193-197433-2812-522-76524-::3-713 !!! DBQJUBM!QSPKFDU!GVOE!6-476-4132:-518314-9356-291-997 ! QPPMFE!!DBTI2-172-9715-573-9144-112-7823-633-::3 IFBMUI!JOTVSBODF!GVOE:9-126258-651214-954252-822 !!!! EFCU!TFSWJDF!GVOE3:3-4493-48:!3:5-828 ! TQFDJBM!SFWFOVF!GVOE3-1:5-22395-13122-3433-277-:11 !! TFEB572-211232-37923-9:467:-585 !! DIJME!TBGFUZ!GVOE29-1892-162!2:-23: !!! DPVSU!UFDIOPMPHZ!GVOE69-5613-999!72-449 !!!! QVCMJD!TBGFUZ!GVOE253-62574-457!316-96: VUJMJUZ!GVOE:-473-41:44-9588:-45::-427-918 3112!CPOE!J!'!T258-:55653259-597 !! 3124!CPOE!J!'!T244-247599!244-735 3129!CPOE!J!'!T96:-59693-879!:53-364 !!! 3133!CPOE!J!'!T534-8812-657!536-427 NFUFS!SFQMBDFNFOU!J'T89-91539:!8:-1:4 MBOEGJMM!GVOE4-38:-:79467-14427-4964-72:-727 !!! TUPSN!XBUFS!ESBJOBHF2-223-114:6-:8651-49:2-278-69: UBY!JODSFNFOU!GJOBODJOH!GVOE268-334373-859248-421393-771 JOWFTUNFOUT3-711-4122-:66!3-713-367 ! !UPUBM!BMM!GVOET53-939-8::7-174-1716-129-66154-984-419 Opuf;!!Sfdfjqut!boe!ejtcvstfnfout!jodmvef!joufsgvoe!usbotgfst!boe!puifs sfdpodjmjoh!bekvtunfout/!!Uifsfgpsf-!sfdfjqut!boe!ejtcvstfnfout!nbz opu!bhsff!xjui!upubm!sfwfovf!boe!fyqfoejuvsft/ TUBUFNFOU!PG!CVEHFU!BOE!BDUVBM!SFWFOVFT!BOE!FYQFOEJUVSFT GPS!UIF!DVSSFOU!NPOUI!BOE!OJOF!NPOUIT!FOEJOH!KVMZ!42-!3136 28/11& UIJT!NPOUISFNBJOJOH CVEHFUBDUVBMZFBS.UP.EBUFCVEHFUSFNBJOJOH SFWFOVFTVNNBSZ; HFOFSBM!GVOE !!UBYFT28-692-:22967-99727-695-317::8-8166/78& !!MJDFOTFT!BOE!QFSNJUT572-34943-584881-923)41:-685*.78/23& !!GJOFT!BOE!GPSGFJUVSFT356-4:132-2292:5-39562-21731/94& !!JOUFSHPWFSONFOUBM443-77661-411325-:73228-81446/49& !!TFSWJDF!DIBSHFT2-464-2:7219-2592-316-525258-89321/:3& !!PUIFS3-378-:91::7-9684-:61-:82)2-793-::2*.85/32& !!!!UPUBM!HFOFSBM!GVOE33-353-4913-176-89133-:31-75:)789-37:*.4/16& TQFDJBM!SFWFOVF!GVOE2-146-569276-935991-254266-42626/11& TFEB877-2:182-923721-2:6266-::631/47& DIJME!TBGFUZ!GVOE4-4362526-316)2-991*.67/65& DPVSU!UFDIOPMPHZ!GVOE26-5512-23:25-4912-1717/97& QVCMJD!TBGFUZ!GVOE5-71193-7:9212-:98):8-498*.3228/22& DBQJUBM!QSPKFDU!GVOE58:-5572:-728679-283)99-837*1/11& EFCU!TFSWJDF!GVOE2-213-5699822-248-173)45-715*.4/25& VUJMJUZ!GVOE23-:24-5782-137-8:421-631-8293-4:3-85:29/64& MBOEGJMM!GVOE2-641-336345-3182-844-31:)313-:95*.24/37& BJSQPSU!GVOE459-9517-79:336-569234-49346/48& TUPSN!XBUFS!ESBJOBHF3-197-96123:-6782-41:-595888-47748/36& !!UPUBM!SFWFOVF!BMM!GVOET53-639-78:4-916-23951-137-7723-613-1296/99& FYQFOTFTVNNBSZ; HFOFSBM!GVOE !!HFOFSBM!HPWFSONFOU3-269-32:213-2672-691-241689-19:37/8:& !!GJOBODF2-835-9:1242-7162-493-778453-3342:/95& !!MFHBM!TFSWJDFT421-13:32-592322-::1:9-14:42/73& TUSFFU!NBJOUFOBODF2-187-:83264-:88843-951455-24342/:6& QBSLT!BOE!MFJTVSF!TFSWJDFT5-56:-663375-2:14-235-5162-446-2583:/:5& !!GJSF5-:36-353511-9745-196-:3994:-42528/15& !!QPMJDF9-78:-:66678-8::6-652-6824-249-49547/27& EFWFMPQNFOU!TFSWJDFT:47-57953-8665:1-478557-21258/75& HJT243-56:7-:34213-9:83:-67333/43& OPO!EFQBSUNFOUBM631-55584-9755:6-:5535-6115/82& !!!!UPUBM!HFOFSBM!GVOE35-:35-3412-876-72328-859-8498-286-5:339/8:& TQFDJBM!SFWFOVF!GVOE987-51851-746628-921469-6:851/:3& TFEB2-286-11154-48:672-965724-25763/29& DIJME!TBGFUZ!GVOE11111/11& DPVSU!UFDIOPMPHZ!GVOE5-44419954-55:1/11& QVCMJD!TBGFUZ!GVOE75-33635-57:45-11241-33558/17& DBQJUBM!QSPKFDU!GVOE5-393-5482:-728422-2834-:82-3761/11& EFCU!TFSWJDF!GVOE2-1::-3361:45-161276-28626/14& VUJMJUZ!GVOE29-3:3-264:69-:1123-799-5566-714-81941/74& MBOEGJMM!GVOE2-4:3-69873-143:97-941516-8683:/25& BJSQPSU!GVOE459-19426-551588-499)23:-416*.48/26& TUPSN!XBUFS!ESBJOBHF2-669-36233-28:2-396-619383-85428/61& !!UPUBM!FYQFOTFT!BMM!GVOET65-127-:423-:63-37446-657-79129-581-36245/2:& OFU!SFWFOVF!)FYQFOEJUVSFT*)7-294-132*963-9765-58:-:91)21-774-112*283/57& wĻǝĻƓǒĻ9ǣƦĻƓķźƷǒƩĻƭ REMAINING REMAINING BUDGET BUDGET 2,502,018 18,470,251 YEAR-TO-DATE 40,026,661 YEAR-TO-DATE 35,546,680 Permit Inspection By Type/Status 7/1/2025 - 7/31/2025 Permit DatePermit TypeDescriptionMain Status Group: Accessory Building Permit 3/4/2025Accessory Approved Building Permit 3/4/2025Accessory Approved Building Permit Group Total: 2 Group: Certificate of Occupancy 7/31/2025Certificate of Under Review Occupancy 7/31/2025Certificate of Under Review Occupancy 5/14/2025Certificate of Under Review Occupancy 5/14/2025Certificate of Under Review Occupancy 6/23/2025Certificate of Under ReviewRetail clothing Occupancyand general merchandise sales to the consumer. 6/23/2025Certificate of Under ReviewRetail clothing Occupancyand general merchandise sales to the consumer. 7/9/2025Certificate of Under ReviewCar Wash Occupancy 3/10/2025Certificate of CompleteIce Cream OccupancyShop Group Total: 8 Group: Commercial Building Permit 11/8/2024Commercial Approved Building Permit 6/23/2025Commercial PendingCommercial Building Office Permit 1/31/2025Commercial ApprovedNew Retail Building Construction Permit Group Total: 3 Group: Commercial Remodel Permit Page: 1 of 10 4/30/2025Commercial ApprovedREMODEL Remodel Permit 7/8/2025Commercial ApprovedAutobody Remodel Collision PermitRepair Facility 6/27/2025Commercial Approved Remodel Permit 4/30/2025Commercial ApprovedREMODEL Remodel Permit 4/30/2025Commercial ApprovedREMODEL Remodel Permit 4/30/2025Commercial ApprovedREMODEL Remodel Permit 4/30/2025Commercial ApprovedREMODEL Remodel Permit Group Total: 7 Group: Driveway, Curb & Gutter, Street Excavation 6/20/2025Driveway, ApprovedExpand two Curb & Gutter, driveways Street Excavation Group Total: 1 Group: Electrical 7/17/2025Electricalinstalling a Approved generator on the side of a residential house 7/18/2025ElectricalNAComplete 4/30/2025Electricalupgrading Approved service to 125amps, wiring 2 bathrooms, replacing light fixtures and devices as needed and adding 6 electrical iit 7/14/2025ElectricalSolar Approved Installation 7/14/2025ElectricalTemp PoleApproved Page: 2 of 10 6/25/2025ElectricalReplace with Approved new 200 AMP meter, Loop and Panel 6/30/2025ElectricalINSTALLING A Approved NEW 200 AMP METER LOOP POLE Group Total: 7 Group: Food Service Permit 7/18/2025Food Service PendingMobile Food PermitTruck 7/18/2025Food Service PendingMobile Food PermitTruck Group Total: 2 Group: Irrigation 7/8/2025IrrigationClosed Group Total: 1 Group: Mechanical 7/22/2025MechanicalReplace HVAC Closed (one) Group Total: 1 Group: Residential Building Permit 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units (549, 553, 557, 561) 12/13/2024Residential ApprovedRESIDENTIAL Building NEW BUILD Permit 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units (549, 553, 557, 561) 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units (549, 553, 557, 561) 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units Page: 3 of 10 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 3/13/2025Residential Approved2 DUPLEXES Building Permit 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units Page: 4 of 10 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit4 units (565, 569, 573, 577) 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 10/2/2024Residential ApprovedNEW Building BUILD/LENNO PermitX DUPLEX#1 10/25/2023Residential PendingNew Building Residential PermitBuild - 12 buildings, 44 units for Stephenville SeniorLiving 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/26/2024Residential ApprovedNew Building residential Permithome 8/29/2024Residential ApprovedNew Single Building Family Permit 12/6/2024Residential Plans 3 UNIT Building ApprovedDUPLEX Permit 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. Page: 5 of 10 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 12/6/2024Residential Plans 3 UNIT Building ApprovedDUPLEX Permit 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 12/6/2024Residential Plans 3 UNIT Building ApprovedDUPLEX Permit 12/6/2024Residential Plans 4 UNIT Building ApprovedDUPLEX Permit 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 3/13/2025Residential Approved2 DUPLEXES Building Permit 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units (525, 529, 533, 537, 541, 545) 12/6/2024Residential Plans 3 UNIT Building ApprovedDUPLEX Permit 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. Page: 6 of 10 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 4/11/2025Residential ApprovedResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units (525, 529, 533, 537, 541, 545) 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units (525, 529, 533, 537, 541, 545) 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units (525, 529, 533, 537, 541, 545) 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. Page: 7 of 10 9/16/2024Residential Under New Building Constructionapartment Permitcomplex build. 4/11/2025Residential ApprovedResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential ApprovedResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units (525, 529, 533, 537, 541, 545) 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential ApprovedResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential ApprovedResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units (525, 529, 533, 537, 541, 545) 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 4/11/2025Residential Under ReviewResidential Building Bldg / 1 bldg, Permit6 units 9/24/2024Residential ApprovedSOPHIA Building STREET PermitDEVELOPMEN T 9/24/2024Residential ApprovedSOPHIA Building STREET PermitDEVELOPMEN T 9/24/2024Residential ApprovedSOPHIA Building STREET PermitDEVELOPMEN T 9/24/2024Residential ApprovedSOPHIA Building STREET PermitDEVELOPMEN T Page: 8 of 10 1/13/2025Residential ApprovedNEW DUPLEX Building Permit Group Total: 84 Group: Residential Remodel Permit 5/30/2025Residential Approved Remodel Permit 5/9/2025Residential Approved Remodel Permit 5/9/2025Residential Approved Remodel Permit 5/9/2025Residential Approved Remodel Permit 1/17/2025Residential ApprovedFOUNDATION Remodel REPAIR, NEW PermitELECTRIC, NEW WINDOWS, NEW PLUMBING, NEW HVAC 1/17/2025Residential ApprovedFOUNDATION Remodel REPAIR, NEW PermitELECTRIC, NEW WINDOWS, NEW PLUMBING, NEW HVAC 6/24/2025Residential Approved Remodel Permit 6/2/2023Residential Under Residential Remodel ConstructionRemodel Permit 6/16/2025Residential ApprovedHOME Remodel ADDITION Permit Group Total: 9 Group: Solar Panel 7/15/2025Solar PanelSolar Approved Installation 6/11/2025Solar PanelSolar Panel Closed and battery install 6/9/2025Solar PanelApproved 5/27/2025Solar Panel693Approved Page: 9 of 10 5/9/2025Solar PanelClosed Group Total: 5 Group: Swimming Pool 6/16/2025Swimming Approved Pool 11/4/2024Swimming ApprovedIN GROUND PoolPOOL 6/16/2025Swimming Approved Pool Group Total: 3 Total Records: 1338/18/2025 Page: 10 of 10 Stephenville Fire Department July 2025 Activity Report Fire/EMS Activity Week Ending7/6/257/13/257/20/257/27/258/3/25Total Operations (11) Structure Fire22 (13) Mobile property (vehicle) fire112 July 1, 2025 –July 31, 2025 (14) Natural vegetation fire11 Operations members completed 689 hours of in-house and off-site (15) Outside rubbish fire11 Fire/EMS Training. (16) Special outside fire11 Topics included: Ground Ladders, Wildland, CPR, and EMS Protocol (20) Overpressure rupture, explosion, overheat, other11 Review. Four members remain in the Paramedic School through TSTC (32) Emergency medical service (EMS) incident2830362321138 (35) Extrication, rescue1113Brownwood. 3 members attended the TEEX annual Municipal Fire School (36) Water or ice-related rescue55 in College Station. 2 of these attended an intense 4-day Advanced Engine (38) Rescue or EMS standby11 Company Operations course (Fire Science, Water Mapping, Hose (40) Flammable gas or liquid condition, other11 handling, and aggressive structural fire fighting tactics). 1 member (41) Combustible/flammable spills & leaks1113 attended a 6-day Fire Officer 1 certification course and obtained his (44) Electrical wiring/equipment problem23128 certification for Fire Officer 1. (55) Public service assistance6385123 Standby Events: Three members of Operations, the Operations Chief, and (60) Good intent call, other112 both members of the Fire Marshall’s office provided Fire/EMS standby and (61) Dispatched and canceled en route3321312 th Fireworks safety during July 4festivities. 3 patient contacts with 0 (62) Wrong location, no emergency found1113 transport occurred. (65) Steam, other gas mistaken for smoke11 (66) EMS call where party has been transported11 Public Education: No PR or Pub Ed events this month. (67) HazMat release investigation w/no HazMat11 TIFMAS Deployments: No Deployments this month. (70) False alarm and false call, other1113 (73) System or detector malfunction5232113 Currently, there are 5 vacancies within the Operations division. We (74) Unintentional system/detector operation (no fire)1124 originally opened our application process at the end of June, and it closed Total5647544231230 on July 31. Our hiring committee will begin sorting through approximately 60 applicants and schedule candidates for the hiring process beginning th August 5. The goal is to have the positions filled, and the new hire FTO Fire Marshal's Office Activity process begin on September 8th. Types of ServiceTotal Annual/Reinspection26 Construction48 Alarm Systems2 Fire Spinkler7 Certificate Occupancy8 General Fire Inspections4 Complaints3 Total Inspections98 After Fire Invest.1 After Hour Call Out6 Plan Review6 Occupancy Limit3 Training3 PR/ Education4 Burn Permits1 Comments Live fire extinguisher trainings provided to Fibergrate and Choices Clinic